YEKA WIND

It includes constructions of wind turbine factory with the capacities of at least 150 units/year or 400 MW/year production and wind power plant to be built in Edirne, Kırklareli, Eskişehir, Sivas regions and to have 1820 MW installed power. The project is included in numbered projects of Turkey in terms of high locality rate and of the world in terms of measures.
Previous Project